Timeline

 Months 1-3:
 
 
bullet

Conduct initial project planning via teleconference to clarify scope, partners, roles and a plan for project initiation workshop
 

bullet

Conduct initiation workshop

 Months 3-6:
 
 
bulletConsult with working groups to clarify analytical and data needs, information flow, specific functional roles, and a process model for applying each DST
 
bulletCollect data and integrate it into shared databases
 
bulletPopulate the DSTs with data, model parameters to support performance indicators, and value inputs from the working groups
 
bulletDefine necessary inputs and outputs among the DSTs
 
bulletDevelop manual interoperability processes
 
 Months 6-9:
 
 
bulletPerform initial analyses to populate starting indicators of socioeconomic and ecosystem variables
 
bulletIdentify areas of conflict
 
bulletDevelop visualizations and presentations
 
bulletHold WebEx demonstrations with working groups
 
bulletDevelop parameters for several alternative future scenarios to address potential or emerging problems
 
 Months 9-15:
 
 
bulletContinue consultation with working groups and local DST users
 
bulletRefine performance metrics plan with working groups
 
bullet

Conduct workshop to present initial analytical results and options to local partners and identify desirable parameters form alternative scenarios
 

bullet

Conduct at at least one community visioning exercise utilizing the tool package (i.e., pre-training exercise to enable the local users to understand how the tools can be used to solve local problems)
 

bulletConduct observations and interviews of local tool users
 
bullet

Develop a database of DST and interoperability improvements that could improve usability, efficiency, or quality of results relative to decision making
 

bullet

Synthesize and prioritize recommendations for improving interoperability and vet these with the working groups
 

 Months 15-18:
 
 

 

bullet

Host an evaluation workshop for the partnership to assess the locally-developed alternative future scenarios, the decision process, the utility of the DST toolkit, and the prognosis for the ongoing integrated planning and implementation
 

bullet

Develop a case study that includes a presentation and written products to inform other coastal communities on how to organize such a project
 

bullet

Feature the case study and outreach products on the Coastal-Marine Ecosystem Based Management Tools program website (www.ebmtools.org)
 

bullet

Link case study website to other relevant websites (NOAA, PlaceMatters, NACo, NEMO)