| | Months 1-3: |
| |  | Conduct initial project planning via teleconference to clarify scope, partners, roles and a plan for project initiation workshop |  | Conduct initiation workshop |
|
| | Months 3-6: |
| |  | Consult with working groups to clarify analytical and data needs, information flow, specific functional roles, and a process model for applying each DST |  | Collect data and integrate it into shared databases |  | Populate the DSTs with data, model parameters to support performance indicators, and value inputs from the working groups |  | Define necessary inputs and outputs among the DSTs |  | Develop manual interoperability processes |
|
| | Months 6-9: |
| |  | Perform initial analyses to populate starting indicators of socioeconomic and ecosystem variables |  | Identify areas of conflict |  | Develop visualizations and presentations |  | Hold WebEx demonstrations with working groups |  | Develop parameters for several alternative future scenarios to address potential or emerging problems |
|
| | Months 9-15: |
| |  | Continue consultation with working groups and local DST users |  | Refine performance metrics plan with working groups |  | Conduct workshop to present initial analytical results and options to local partners and identify desirable parameters form alternative scenarios | 
| Conduct at at least one community visioning exercise utilizing the tool package (i.e., pre-training exercise to enable the local users to understand how the tools can be used to solve local problems) |  | Conduct observations and interviews of local tool users |  | Develop a database of DST and interoperability improvements that could improve usability, efficiency, or quality of results relative to decision making |  | Synthesize and prioritize recommendations for improving interoperability and vet these with the working groups |
|
| | Months 15-18: |
| | 
| Host an evaluation workshop for the partnership to assess the locally-developed alternative future scenarios, the decision process, the utility of the DST toolkit, and the prognosis for the ongoing integrated planning and implementation |  | Develop a case study that includes a presentation and written products to inform other coastal communities on how to organize such a project |  | Feature the case study and outreach products on the Coastal-Marine Ecosystem Based Management Tools program website (www.ebmtools.org) | 
| Link case study website to other relevant websites (NOAA, PlaceMatters, NACo, NEMO) |
|
| | |
| |